Saturday, February 6, 2010

R5's final leg work

Today Brad and Syrena stopped over to get R5's legs. I set up the drill press to drill the bottom swivel hole and Brad drilled the first leg.
Once the first one was done Syrena did the second one. Now R5 is ready to be put together and standing.
Also I just got done ordering 6 servos. Two for Patches, Two for T3, and Two for R3-PD.

No comments: