Well other than finding that robot book today, nothing happened.
To cold to sand outside and no new parts came in the mail.
Considering I did not start my R2 build until January 1st 2008, I think I have got a lot done.
I wonder when this run of 300Domes will ship? I can't wait to get mine!
Also I am wondering when the next run of aluminum skins is going to start.
My goal is to have him 80% done by the end of the year.
I would like him moving under his own power and no wood showing by December 31st
I still need to pick out a control system. I plan on my R2 a.k.a. "Patches" to do a lot of things.
Other than moving around he will have about 8 mini micro controls that will open and do stuff.
Things like a periscope, fire extinguisher, data arm, arms moving, the dome will move, and the holo will jump around, etc..............
So if anyone has some ideas let me know!
1 comment:
sounds like you have your work cut out on this build. Good luck w/ it.
Post a Comment