After the leg work Brad and I helped Jeff with his droid. After a bit of fine tuning we were able to get his dome movement set up working right.


Next we put the T-nuts in the frame that holds the inner workings together.

Then Jeff went to town grinding off the extra bits of bolt that stuck through the bottom.
No comments:
Post a Comment